4/10

Garage

We used C and J for our garage. Their "builders" have not squared up anything. Our joist are not square, our roof is not straight, one length is an inch longer than the other.
Work crew was great, all issues I have had fall on the owner. Supplies did not turn up when I was told they would. Framers didn't waterproof the man door, nor did they waterproof the window. I have a 5mm gap in the timber work above the OHD as they ran out of timber. Not a biggie but looks crappy. Nails were left everywhere. Gaps between osb board range for 0-10mm. Framers did not use a table saw to cut these boards, or another method to make cuts straight.
I would not recommend to family and friends.

Approximate cost of services:
$25,000.00
1 of 2 people found this review helpful.
Was this review helpful?
Company Response

Previous versions of this review:

Naomi in Calgary
Private User
1 review Calgary, AB
2/10

Garage

We used C and J for our garage. We were to do electrical ourselves. Their "builders" have not squared up anything. Our joist are not square, our roof is not straight, one length is an inch longer than the other. They also did other garages down our street. Upon inspection of one of these other properties over a 24' garage it is out 2" on the curb. Yes the floor with a bit of drainage, but why does the curb fall with the garage.
Back to my property, work crew was great, all issues I have had fall on the owner. Other supplies were not delivered on time, after calls to Joe "yes it will be there tomorrow" a week later and still had not turned up. 6 weeks for the garage door to arrive. Framers didn't waterproof the man door, nor did they waterproof the window. I have a 5mm gap in the timber work above the OHD as they ran out of timber. Not a biggie but looks crappy. Nails were left everywhere. Gaps between osb board range for 0-10mm. Why would you put your cut osb boards at eye sight, why not put them at the top? Why are the framers not using a table saw for these cuts and using a circular saw and "eyeballing" these cuts.

I would not recommend these guys to anyone. Slabs cracking in less than 6months down the street.

Approximate cost of services:
$25,000.00