- Approximate cost of services:
- $25,000.00
- Company Response
Hi Stephanie,
I appreciate the kind review, It was a pleasure working with you guys and look forward to working together on future projects.
Hi Stephanie,
I appreciate the kind review, It was a pleasure working with you guys and look forward to working together on future projects.
Thank you Pierre for the kind review, it was a pleasure working for you on this project and look forward to working together on future projects.
Thanks for the positive review Nick, it was a pleasure working with you and look forward to working with you in the future.
Thanks,
Jason
Commerical and Residential renovations
Hello Brent,
I appreciate your positive review and it was a pleasure to provide and meet your design and build needs!
Thank you,
Jason
This entry did not meet HomeStars review criteria.
In reading this review i have to come to the conclusion that this is nothing more than an attack on my company that i take very personal.
In reviewing this slanderous attack i take exception to the the following untruths:
As the project did take 3 months to complete not 7 as stated, this was due to the fact that this project had more than tile and insulation,
The ceiling framing, the full electrical including pot lights and the rough in and instalation of a ceiling fan, re-doing the entire plumbing system from new drains and feeds and shutoffs, the building of a custom shower pan, insulating and drywalling of the bathroom, leveling of the floor as there was an inch and half over 4 feet drop off, as well during this process the basement was receiving the finishing touches and most of the house was also painted.
As for this "deadline" i told them that i would have it functional for her birthday, which i did, everybody raved about the bathroom at this time.
The only thing that was not done was the custom glass which was ordered late due to the fact the client did not take my advice as to cover 2/3 of the opening as the ordered glass that only covered half the opening against my opinion.
As for the final bill i told them i was going to charge them $5000.00 for labour plus material, the tiles on the wall and floor were $7 each and the custom mirror was $500.00 and the shower head was $600.00 just give examples of the high end pieces that went into this build and hence the cost which actually came in at under 10,000.
As for these smoke breaks and lunches and start and finish times, they are highly exaggerated as April was not there for most days so how would she know how long my lunches were and what time i left????
How is tile work not legal???
As for not calling or returning calls that is a flat out lie, As i have phone records to prove this fact if there is any question of this
Thank You
Jason