Powder room toilet to basement
Naz
Came out told me what needs to be done
We organized for the following week
He arrived The following week inspected the situation with the camera found the problem
Andrew and a fellow employee got started and worked from the beginning to the project completion The did not leave one spec of concrete or mess after removing and replacing the concrete and pipes the floor from the front door to the basement was covered with there drop sheets and once they left it did not look like they had been here except for the concrete that has to dry no one would even
Know that anything was done
The toilet in the powder room was replaced and bolted into place and the job was complete