The Installation process began at the end of July and the Panels were installed Dec 13 2024. Polaron staff were helpful during the process. Installation teams were efficient and professional. Overall it has been a painless process, and easier than I thought it would be. We are waitng for the final inspection fron NSP on Dec 18th 2024 and then the connection to the grid should be complete.

Approximate cost of services:
$17,000.00