Installing floor drain with back flow preventer
Installation of brand new cartridge
Client had a complaint about water not going through catch basin. We solved it.
Client had a complain about her backed up sink that couldn’t be unclogged even with previous plumber showing up. We showed up and showed them how it’s done.
The previous Contracter left the job a mess for whatever disagreement they had. We went took over the second dig is our dig pretty small but we did our work for out of there in 2 days vs the Contracter who was there for 2 weeks he couldn’t finish it.
Basement new line in installation with a clean out access for future cleaning.
Installing a backflow water valve house basement
Clean out installation on apartment building behind kitchen cabinet
Brand new 4” PVC underground basement house.
Basement clean out installation.
30 Ft / 3 Floor cast iron pipe change APPX 10’ each line. Behind the kitchen cabinets.